A few weeks ago we put into operation a small station in Podlasie (Turośl near Kolno) with a capacity of 300 m³/d.
The modernized Water Treatment Plant operates in the following technological scheme:
- raw water pumped by two deep well pumps to the pressure aeration system,
- the overhead water in the static mixer and contact tank flows to the filtration system,
- the filtration system consists of four first-stage filters, rinsed with air and water,
- treated water pumped into treated water retention tanks,
- final disinfection with chlorine dioxide produced in the generator, with a disinfectant dosing point before the retention tank,
- water from the tanks is pumped into the network using a network pumping station,
- washings discharged into the sewer system.
Photos of the completed station are attached.
The construction was led by our positive and always smiling Gosia!
Gosia, as befits an ambitious and characterful woman, completed the task without any problems and in an exemplary manner!
Thank you Gosia and colleagues!