The station has a capacity of over 100 m³/h obtained as part of the traditional two-stage pressure filtration. Due to the possibility of obtaining funding from the KPO, the task was conditionally divided into two stages: Stage 1 - development of three-dimensional design documentation (2024), Stage 2 - implementation of works based on the developed documentation after possible obtaining funding (2025). The advantage of this formula in this case is the next year's implementation of works at a guaranteed - current price level, i.e. from the period before the introduction of the KPO.